the KU-Plasma Analytical
Laboratory!
Date What happened
12/2/03
Macpherson updates the KU-PAL web page.
12/1/03
U-Th measurements successful on ICP-MS
(D.Stockli and T. J.
Dewane)
12/1/03
Repaired camera installed on Microdrill.
Equipment
Status, 12/1/03:
Up ICP-Atomic
Emission Spectrometer
Up Laser
Ablation Microprobe
Up Microdrill
(camera sent back for repairs)
Up Ion
Chromatograph
Up UV/VIS
Spectrophotometer
Up Boiling
water still
Up NanoPur
Deionizer
Up ROPure
ST (reverse osmosis water purifier)
Up Quartz
sub-boiling still
Up Class
1000 clean lab
Up The
BTV (hydrogeolology sampling van)