Breaking News from

the KU-Plasma Analytical Laboratory!

 

 

 

Date                      What happened

 

12/2/03              Macpherson updates the KU-PAL web page.

12/1/03                U-Th measurements successful on ICP-MS

                                   (D.Stockli and T. J. Dewane)

12/1/03                Repaired camera installed on Microdrill.

 

 

 

Equipment Status, 12/1/03:

Up                                      ICP-Mass Spectrometer

Up                                      ICP-Atomic Emission Spectrometer

Up                                      Laser Ablation Microprobe

Up                                      Microdrill (camera sent back for repairs)

Up                                      Ion Chromatograph

Up                                      UV/VIS Spectrophotometer

Up                                      Boiling water still

Up                                      NanoPur Deionizer

Up                                      ROPure ST (reverse osmosis water purifier)

Up                                      Quartz sub-boiling still

Up                                      Class 1000 clean lab

Up                                      The BTV (hydrogeolology sampling van)